EICR codes explained: what C1, C2, C3 and FI mean for landlords

Short answer: C1 means danger is present, C2 means potentially dangerous, C3 means improvement recommended, and FI means further investigation is needed. A C1 or C2 makes the report unsatisfactory, and as a landlord you must have the remedial work done within 28 days, or sooner if the report says so. A report with only C3s is satisfactory.

What each EICR code means

  • C1, danger present: there's a risk of injury now. The inspector may make it safe before leaving, or tell you to act straight away, for example by switching off and isolating the circuit.
  • C2, potentially dangerous: not an immediate danger, but it could become one if there's a fault. Urgent remedial work is needed.
  • FI, further investigation: the inspector saw something they couldn't fully check, so they can't rule out a danger.
  • C3, improvement recommended: not dangerous, but improving it would make the installation safer. Not every difference from today's wiring rules gets a C3; many get no code at all.

The wiring regulations (BS 7671) change over time. An older installation isn't unsafe just because it was built to an earlier edition, which is why so many observations are C3 rather than C2.

Common EICR observations and how they're usually coded

Electrical Safety First's Best Practice Guide 4 is the guidance most inspectors use to code observations consistently. This is how it usually codes the items landlords ask about most. The inspector still uses their judgement on the spot, so ask them to explain any code you're unsure about.

  • Live parts you can touch (missing blank in the consumer unit, broken socket or switch)

    Usual code: C1

    Danger present. The inspector may make it safe before leaving.

  • No RCD on sockets that may supply equipment used outdoors

    Usual code: C2

    For example a lawnmower or pressure washer plugged in near a door.

  • A socket circuit in a bathroom or shower room with no RCD

    Usual code: C2

  • No main protective bonding to incoming water or gas pipes

    Usual code: C2

    Bonding that's present but hard to reach, or fixed to a branch pipe where continuity isn't assured, is usually C3. Bonding of at least 6 mm² with no heat damage, just thinner than today's standard, isn't usually coded.

  • No supplementary bonding in a bathroom where it is needed

    Usual code: C2

    Often it isn't needed: if the bathroom meets the wiring rules' conditions, including RCD protection, there's nothing to code.

  • No RCD on other indoor sockets

    Usual code: Usually C3

    Where they're unlikely to supply outdoor equipment and aren't in a bathroom.

  • Cables less than 50 mm deep in a wall, with no RCD or other mechanical protection

    Usual code: C3

  • A Type AC RCD where a Type A is required

    Usual code: C3

  • No surge protection device (SPD)

    Usual code: C3 or not coded

    C3 only where the wiring regulations require one; otherwise it isn't coded.

  • Plastic consumer unit

    Usual code: Usually not coded

    C3 if it's under a wooden staircase or in the only escape route and not in a non-combustible enclosure.

Satisfactory or unsatisfactory?

Any C1 or C2 makes the overall result unsatisfactory. Best Practice Guide 4 says it wouldn't be reasonable to mark a report unsatisfactory if there are no C1 or C2 observations, so C3s alone don't fail. Under the same guidance an FI on its own shouldn't make it unsatisfactory either, though some inspectors still mark it that way.

Be wary of quotes to “clear” C3s before a certificate is valid. A report with only C3s already is. C3 work can still be worth doing, for example adding RCD protection when you rewire a kitchen.

What landlords must do, and by when

  • Remedial work for C1 and C2 items within 28 days of the inspection, or sooner if the report says so.
  • Written confirmation that the work is done, to the tenant and the council, within 28 days of finishing it.
  • A copy of the report to the council within 7 days if it asks.

The FI rule changes on 30 November 2026. For inspections completed before that date, the regulations also require any further investigation within 28 days. For inspections completed from 30 November 2026, the 28-day duty covers remedial work only. Don't ignore an FI either way: you still have to keep the installation safe, so fix anything the investigation finds promptly.

The penalty for breaching the regulations is up to £40,000. The EICR guide for landlords covers every deadline, who gets a copy and how often you need a new report.

FAQ

Does a C3 on an EICR mean it has failed?

No. C3 means improvement recommended. A report with only C3 observations is satisfactory, and you don't have to do C3 work, though it is often worth doing.

What does C2 mean on an EICR?

Potentially dangerous. It isn't an immediate danger, but it could become one if there's a fault. A C2 makes the report unsatisfactory and a landlord must have it fixed within 28 days of the inspection, or sooner if the report says so.

Does an FI code mean the EICR is unsatisfactory?

Under Electrical Safety First's Best Practice Guide 4 it shouldn't, because only C1 and C2 make a report unsatisfactory, though some inspectors still mark it that way. Get an FI investigated promptly anyway: for inspections completed before 30 November 2026 the law requires this within 28 days, and you still have to keep the installation safe, so fix anything it finds.

Is no RCD protection a C2 or a C3?

It depends where. Sockets that may supply equipment used outdoors, and socket circuits in a bathroom, are usually C2 without an RCD. Other indoor sockets are usually C3.

Is a plastic consumer unit a fail on an EICR?

Usually not. Electrical Safety First's guidance says a plastic consumer unit isn't normally coded on an EICR. It's usually a C3 if it's under a wooden staircase or in the only escape route without a non-combustible enclosure.

How long do I have to fix C1 and C2 items?

28 days from the inspection, or less if the report says so. Then give written confirmation that the work is done to the tenant and the council within 28 days of finishing it.

Sources

Disclaimer: This guide is general information for UK landlords, not legal or financial advice. Law and practice change — always confirm the current position, and take advice on anything that matters. General guidance for landlords in England, not legal or electrical advice, checked on 21 November 2026. Your inspector's coding applies to your report.

Run your portfolio on autopilot

RentFig is property management software built for UK landlords — tenancies, rent tracking and chasing, compliance, AI assistant. Free plan for up to 2 tenancies.

or try every feature free for 30 days (card or Direct Debit needed)

Accurate as at .